JOINSOLVE

 

Joinery jobs don’t fail on the tools.
They fail before they get there.

 Fix the gaps between estimating, drafting, manufacturing and site — before they turn into rework. 

For joinery businesses under pressure to deliver.

Reduce rework. Improve delivery. Protect margin.

Most joinery businesses don’t lose money on the tools.

 They’re losing it between handovers. 


  • Drawings that aren’t buildable.
  • Materials not ready when needed.
  • Factory making assumptions.
  • Site dealing with the fallout.
  • That’s where margin disappears.

What I do

   I step in where things are slipping and fix the structure before it turns into rework. 


• Align estimating, drafting and production
• Set up systems that reflect how your business actually runs
• Catch issues before they hit the factory or site
• Help teams deliver consistently under pressure


Proven Inside Real Joinery Businesses

Not theory. Not software demos.
This is work done inside active joinery shops under real pressure.


 This is where most businesses lose money. 

 

Buildability fixed before it becomes rework.


Infracraft Detailed Joinery

“Dwayne brought strong buildability thinking into pre-construction, making sure issues were resolved before reaching the factory or site.
He identified problems early, reduced RFIs, and ensured drawings were practical for manufacture and installation.
This made delivery smoother and helped avoid unnecessary site issues and rework.”

 (Issues resolved before reaching site — not after) 


Simon Ruytenberg

Senior Project Manager
Infracraft 



Reduced headcount. Increased output.


Infracraft Detailed Joinery

“During a period of rapid growth, Dwayne restructured our drafting team and introduced stronger systems and processes.
He reduced headcount while increasing output and productivity, improving efficiency across the business.”


Paul Pierlot
Director, Infracraft
(Available for reference on request)



 Systems implemented. Estimating, drafting and production aligned. 


North Coast Cabinets

“Dwayne implemented Monday.com across our workflow, refined our Cabinet Vision construction methods, and aligned CNC output.
He also introduced live pricing for fast, accurate estimating.
This improved workflow, reduced rework, and gave us much better control across the business.”


Ben Lamont
Director, North Coast Cabinets



22+ years across install, drafting, estimating, manufacturing and project delivery  

I’ve seen where projects actually break — and how to fix them.


If your business feels:


• Busy, but disjointed  

• Profitable on paper, but messy in delivery  

• Too reliant on certain people to hold it together  


That’s exactly where I step in.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Your details are only used to respond. No spam.

JOINSOLVE

  Not selling systems. Here to tighten what you already have.  

Dwayne Dawes  

ABN:  12 101 057 471 

dwayne@joinsolve.com.au  

0499 944 010

Copyright © 2026 JOINSOLVE - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept